sag04
Structural
- Jun 5, 2004
- 17
I'm working as a civil engineer in Middle east (U A E). here the day temperature is around 44 to 50 o C. What is the most pratical curing I can adopt at this temperature and days of curing for mass concrete,pile caps, Column and slabs. BS 8110 gives some values for curing days but it is limited to two class one between 0 to 10 and second one for 10 to 25 oC. Please help me with your comments. I will be obliged.