Hydraulic Jump in Sequential Check Dam Modelling
Hydraulic Jump in Sequential Check Dam Modelling
(OP)
I would like to model a trapezoidal channel with three sequential check dams.
I am using this BMP for peak rate and volume control.
Channel Slope = 0.06 ft/ft (average of the three)
Width= 2 ft
Sides = 4:1
Depth = 2 ft
Height of Check Dam = 1.50 ft
Section L = 90 ft; 180 ft; 180 ft (upstream to downstream)
I have this routed in HydroCAD: Reach > Pond > Reach > Pond > Reach > Pond with each reach having it's own drainage inflow.
I have the check dams modeled as a broad-crested weir in each pond. Flow overtops each of the check dams, and flows to the downstream reach.
My question: Is there a way to see the elevation of the hydraulic jump in the downstream channel to ensure the elevation remains within the section?
Thanks in advance, file is attached if that helps.
I am using this BMP for peak rate and volume control.
Channel Slope = 0.06 ft/ft (average of the three)
Width= 2 ft
Sides = 4:1
Depth = 2 ft
Height of Check Dam = 1.50 ft
Section L = 90 ft; 180 ft; 180 ft (upstream to downstream)
I have this routed in HydroCAD: Reach > Pond > Reach > Pond > Reach > Pond with each reach having it's own drainage inflow.
I have the check dams modeled as a broad-crested weir in each pond. Flow overtops each of the check dams, and flows to the downstream reach.
My question: Is there a way to see the elevation of the hydraulic jump in the downstream channel to ensure the elevation remains within the section?
Thanks in advance, file is attached if that helps.
RE: Hydraulic Jump in Sequential Check Dam Modelling
In many cases you can simply omit the reach and model pond-to-pond, which will preserve the tailwater capabilities of each pond and it's associated outlet devices. (All pond outlets are tailwater-sensitive)
For additional details please see www.hydrocad.net/checkdams.htm
Peter Smart
HydroCAD Software
www.hydrocad.net
RE: Hydraulic Jump in Sequential Check Dam Modelling
If you're not worried about the gradually varied flow profile through your ditches, model all three as ponds.
Hydrology, Drainage Analysis, Flood Studies, and Complex Stormwater Litigation for Atlanta and the South East - http://www.campbellcivil.com
RE: Hydraulic Jump in Sequential Check Dam Modelling