In NX8.5, is there a possibility to have in a BOM column the value of the quantity column multiplied by a user constant value?

 
It can be done.
Just turn on the 'evaluate cell as formula'.
Then in the default text field put in $~Q*1.1 (or whatever multiplier you need).

To use 1.1, make sure the number of decimal places for the column is set as well.
The image below shows how it's done
download.aspx


Anthony Galante
Senior Support Engineer


NX3 to NX10 with almost every MR (21versions)
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top