216
In NX8.5, is there a possibility to have in a BOM column the value of the quantity column multiplied by a user constant value?

 
Replies continue below

Recommended for you

It can be done.
Just turn on the 'evaluate cell as formula'.
Then in the default text field put in $~Q*1.1 (or whatever multiplier you need).

To use 1.1, make sure the number of decimal places for the column is set as well.
The image below shows how it's done