Oct 2, 2010 #1 farmer2 Mechanical Joined Jul 29, 2006 Messages 57 Location US Has anyone had EMC tests per 2004/108/EC performed by SGS-CSTC in Shanghi? The tests are on low voltage DC motors and under the machinery directive they do not have to be tested by a notified body lab. This lab is not a notified body. Any comments?
Has anyone had EMC tests per 2004/108/EC performed by SGS-CSTC in Shanghi? The tests are on low voltage DC motors and under the machinery directive they do not have to be tested by a notified body lab. This lab is not a notified body. Any comments?