design time question

Status
Not open for further replies.

adognamedgromet

Automotive
Apr 22, 2002
16
I am quoting for Mold design. How much time is average for a mold design to be done?

I have some customers and they are asking me to quote various things. Solids and a four drawing layout. Or Solids and complete detailing etc. Complete detailing takes a lot of time and seems to be 2-3 times the price of no detailing.

To try to remain competitive time estimating is really important. As a contract designer you don't know who you are competing against or what there prices are.

Customers also have a tendency to bend the truth as to how much time these take or how much they cost. Trying to live up to something unrealistic is very difficult.

More time = better quality not less.

I have been keeping a good log of time for each mold so to gauge this better (more scientific also).

Any other suggestions for estimates?
What is average for these designs?

Regards



Rick Marmei - Tool Designer
 
Replies continue below

Recommended for you

Hi,

The tool designer (in UK) known to me simply agrees a percentage of the price the toolmaker charges for the tool. I think it is around 10 per cent.

Rgds
 
Status