I am quoting for Mold design. How much time is average for a mold design to be done?
I have some customers and they are asking me to quote various things. Solids and a four drawing layout. Or Solids and complete detailing etc. Complete detailing takes a lot of time and seems to be 2-3 times the price of no detailing.
To try to remain competitive time estimating is really important. As a contract designer you don't know who you are competing against or what there prices are.
Customers also have a tendency to bend the truth as to how much time these take or how much they cost. Trying to live up to something unrealistic is very difficult.
More time = better quality not less.
I have been keeping a good log of time for each mold so to gauge this better (more scientific also).
Any other suggestions for estimates?
What is average for these designs?
Regards
Rick Marmei - Tool Designer
I have some customers and they are asking me to quote various things. Solids and a four drawing layout. Or Solids and complete detailing etc. Complete detailing takes a lot of time and seems to be 2-3 times the price of no detailing.
To try to remain competitive time estimating is really important. As a contract designer you don't know who you are competing against or what there prices are.
Customers also have a tendency to bend the truth as to how much time these take or how much they cost. Trying to live up to something unrealistic is very difficult.
More time = better quality not less.
I have been keeping a good log of time for each mold so to gauge this better (more scientific also).
Any other suggestions for estimates?
What is average for these designs?
Regards