rdvette
Electrical
- Oct 22, 2009
- 2
I am required to do a hipot acceptance test of newly installed 15KV EPR copper cable. I have heard that a standard rule would be to Hipot at 3 times the rated cable voltage or 45KV DC. Is this a good rule to follow?