Welding community members,
I was told that CS 2"sch std groove weld joint with manual GTAW could be done at 6 minutes. Based in my experience that I have with process It could be done at minimum 15 minutes to 20 minutes. This include positioning, tack weld and welding in 2GR position.
How much do you perform sich weld no matter how are the wire diameter and the number of passes ?
I appreciate any contribution.

EWE
Belgium
 
Replies continue below

Recommended for you

I THINK

6 Minutes Rolled out for a .218" coupon is quick but I think it is possible. It would have to be rolled out and the current would have to be changed as passes were deposited.

I would have to try it.

Gerald Austin
Iuka, Mississippi
 
pipewelder1999,

Thanks for answer.

If you have time to try !