Malapai, solid rock. Jointed, not able to cut very well.
D9 allowed, blasting allowed, geoligist has surveyed site...bores were inaccurate to depict rock surface (needed
more boring or test pits, but we are at the construction
stage)...hauled and used on site, excavation is horizontal.
im just looking for a general estimate based on cutting
through solid rock.