weld9
Petroleum
- Apr 20, 2014
- 6
ASME Sec.9 states that the organization that has operational control over welding (manufacturer/contractor), is responsible for qualifying the WPS to be used in production welding. Is it permissible allow a contractor to use a clients' WPS/PQR to perform field welding for that client on an ASME code project?