Hi folks,
I'm using iLevel's "Parallam Plus" beams for an exterior deck, and they provide reduced allowable design stresses to be used due to the pressure treating. Do I also need to apply the Cm factor? Seems to me that's like double dipping. I've tried calling iLevel but apparently they're really short staffed and aren't able to take calls...
I'm using iLevel's "Parallam Plus" beams for an exterior deck, and they provide reduced allowable design stresses to be used due to the pressure treating. Do I also need to apply the Cm factor? Seems to me that's like double dipping. I've tried calling iLevel but apparently they're really short staffed and aren't able to take calls...