annsera
Electrical
- May 29, 2009
- 3
Hi everyone,
In my state, subdivisions receive approval that create only the lot lines and the roadway. Most designs have infrastructure for the roadway and stubs to bring utilities to each lot, but they do not have final grading, landscaping, building footprint, impervious surface amounts like driveways/walkways, etc. Some municipalities require that the developer create stormwater systems that will accommodate the entire subdivision, including the build-out. The municipality will evaluate the proposed stormwater system largely through examination of the stormwater report, which will include the HydroCAD analysis. The engineer must design a storwmater system and present a hydroCAD analysis when they do not know what the proposed conditions really are.
What are the typical assumptions that engineers make in this situation?
In my state, subdivisions receive approval that create only the lot lines and the roadway. Most designs have infrastructure for the roadway and stubs to bring utilities to each lot, but they do not have final grading, landscaping, building footprint, impervious surface amounts like driveways/walkways, etc. Some municipalities require that the developer create stormwater systems that will accommodate the entire subdivision, including the build-out. The municipality will evaluate the proposed stormwater system largely through examination of the stormwater report, which will include the HydroCAD analysis. The engineer must design a storwmater system and present a hydroCAD analysis when they do not know what the proposed conditions really are.
What are the typical assumptions that engineers make in this situation?