BadgerPE
Structural
- Jan 27, 2010
- 500
Hey all,
First off, I apologize for the simple nature of this question. It is something that has had me puzzled for some time now. For an arbitrary 3-sided building addition where the 4th side is made up of the existing building wall, what is the proper way to design the MWFRS for lateral loads in the transverse direction? Do I design the ceiling diaphragm to transfer transverse lateral loads to the collectors and then on to the new shear wall?
First off, I apologize for the simple nature of this question. It is something that has had me puzzled for some time now. For an arbitrary 3-sided building addition where the 4th side is made up of the existing building wall, what is the proper way to design the MWFRS for lateral loads in the transverse direction? Do I design the ceiling diaphragm to transfer transverse lateral loads to the collectors and then on to the new shear wall?