I'm having trouble designing concrete piles in very poor soil, namely, I'm chasing my tail with increasing the load on the pile using the dead weight of the pile itself.
Question: Is there any justification for removing the dead load factor (1.25 for Canadian designs) for the pile dead weight alone?
My (albeit weak) justification is based on having a very good idea of the dead load of the pile, and that it is very consistent.
Any thoughts?
My client is fairly adamant about making concrete piles work...