INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

1/3 stress increase applicability

1/3 stress increase applicability

1/3 stress increase applicability

(OP)
A provided geotech report states that "Bearing capacities may be increased by 1/3 for transient loads, such as wind loads." (Transient defined as temporary loads of limited duration). ASCE7-05 states that "Increases in allowable stresses shall not be used with load combinations given in this standard unless it can be demonstrated that such an increase is justified by structural behavior caused by rate or duration of load." Commentary (p255) from same code says that LRFD load combinations use factors less than unity applied to VARIABLE loads. Commentary (p257) says ASD applies 0.75 factor to variable loads. Then states "Some material design standards that permit one-third increase in allowable stress for certain load combinations have justified increase by same concept. Where that is the case, simultaneous use of 1/3 increase and 25% reduction in combined loads is not permitted." "In contrast, allowable stress increases that are based upon duration of load or load rating effects, which are independent concepts, may be combined with the reduction factor for combining multiple variable loads. In such cases the increase is applied to the total stress; that is, the stress resulting from the combination of all loads."

Is there an official "material design standard" for geotechnical that permits the 1/3 increase in stress available for "duration of load or load rating effect"? Do stress levels resulting from ASD formulae need to be treated differently from those found thru LRFD with regard to the 1/3 increase in bearing capacity? Only in some cases? Wind and Seismic are variable AND of limited duration. So which rules apply? Is the added capacity only applicable to loads resulting from wind and seismic, or to the total from worst case load combo? Is this confusing?

Thanks in advance for your help.
Replies continue below

Recommended for you

RE: 1/3 stress increase applicability

The geotech report would be wrong if it conflicts with the underlying governing code and its referenced standards.

Under the IBC, Section 1804 requires you to use either of the two types of ASD load combinations.  One type allows the 1/3 stress increase and the other doesn't.

RE: 1/3 stress increase applicability

Remember that soils don't settle or "deflect" instantaneously.  Even sandy soils take some finite amount of time to settle.  Given that our typical transient loads last a few seconds or a few minutes, and settlement often governs your bearing capacity, it is reasonable to allow an increase for short term loading.   

Of course, it is up to you to decide when and if it should be used.  I tend not to.

RE: 1/3 stress increase applicability

If a geotech report has such a statement, I DO tend to use the increase in combination with the building code load combinations with the (maybe misguided) thinking that it falls under the statement "...allowable stress increases that are based upon duration of load or load rating effects, which are independent concepts, may be combined with the reduction factor for combining multiple variable loads. In such cases the increase is applied to the total stress; that is, the stress resulting from the combination of all loads" for the same reasons that UcfSE mentions.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close