YoungGunner
Structural
- Sep 8, 2020
- 98
I'm staring at our company's details, other engineer details/notes, and I'm seeing a consistent idea that bars should be lapped 40 times the bar diameter. But in staring at ACI for any development equations, tension or compression, I don't get that value. Any insight to this? I'm mainly trying to figure out the correct lap splice for vertical dowels into the bottom of a foundation wall (pinned-pinned, not cantilevered) where neither tension or compression are a concern, but I'm concerned I don't understand lap splices enough when I see 40db everywhere but can't come up with its origin.