Pressure and temperature will determine whether you require butt (groove) welded joints or socket (fillet) welded joints.
You shouldn't be mixing the two together.
LI's description of "Frankensteins monster" is an apt description !
The ASME codes are not in the business of saying don't do this or don't do that. They tell you what you can do at what pressure and temperature for example.
They assume some level of knowledge and experience in the user.
This goes under the listing of both those above.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.