You may want to investigate the applicable building code for additional requirements for CJP welds.
AWS D1.1 requires VT for structural welds as the base line extent of inspection. However, D1.1 is not a stand-alone document, other codes may apply depending on the end-use of the structure and they may invoke additional requirements.
I would quote chapter and verse, but different areas of the country may use different editions of the building code or a different building code.
Other considerations must be checked, such as the type of loading, static versus cyclic, seismic versus non-seismic loading, etc.
AWS D1.1 gives the Engineer wide latitude when making decisions on whether to invoke specific requirements or to allow exceptions to the requirements of D1.1. For instance, the Engineer can accept welders qualified to different welding standards or WPSs that were qualified to different standards. They can allow non-listed base metals to be included as prequalified and exempt from testing. They can even permit alternative procedures and acceptance criteria to be used for the purpose of inspection.
Best regards - Al