For development of one of oil field in offshore, we are in the process of installing an unmanned well head platform. The well fluid (Mainly gas) from the said unmanned platform is to be transported to a process complex via sub sea pipe line of size 28". During detail engineering for top side modification at the process complex it is found that routing of the pipe line with 5D bend is difficult in the topside of the platform.
Therefore, it has been suggested by the agency involved in the construction of the top side portion of the pipeline that the top side of the pipeline to be routed with minimum 4D bends radius and sub sea portion of the pipeline to be routed with 5D bend.
In my company so far all sub sea pipelines are routed with 5D bends only. Therefore I would like to know your view /suggestion w.r.t to pipeline maintenance concerning the following points:
Pigging of the pipeline with scrapper pig or any other pig with min 4D bend radius.
Intelligent pigging min. 4D bend radius.
Any other pipe line maintenance related problems with use of 4D bend.
Your kind and early response on the above issue shall be highly appreciated.
Therefore, it has been suggested by the agency involved in the construction of the top side portion of the pipeline that the top side of the pipeline to be routed with minimum 4D bends radius and sub sea portion of the pipeline to be routed with 5D bend.
In my company so far all sub sea pipelines are routed with 5D bends only. Therefore I would like to know your view /suggestion w.r.t to pipeline maintenance concerning the following points:
Pigging of the pipeline with scrapper pig or any other pig with min 4D bend radius.
Intelligent pigging min. 4D bend radius.
Any other pipe line maintenance related problems with use of 4D bend.
Your kind and early response on the above issue shall be highly appreciated.