CTW
Structural
- May 30, 2002
- 312
I'm analyzing an existing beam which had a column removed about 12 years ago. See attached sketch. The beam was supported and extended in an unusual manner. A new beam was added parallel to the existing one with the bottom flange of the new beam welded to the top flange of the existing beam. The new beam length is 7'-5" with a 48" overlap with the existing beam. The connection on the other end of the new beam is two bolt double angle. The other end of the existing beam bears on top of a column.
I'm curious how others would approach the analysis. The total span is 44'-2". New beam size is W14x43 and existing beam size is W18x40.
I'm curious how others would approach the analysis. The total span is 44'-2". New beam size is W14x43 and existing beam size is W18x40.