Phat Ph
Mechanical
- May 15, 2018
- 2
Hi,
I have 8 holes that I need to define the locations of in my drawing. I feel that GD&T might be the best course of action here. As you can see in the picture, I have 4 datums, the 4th one being the "main" hole. Every other hole is referenced off of it. Is this correct? How would you do it better?
Version 1L See attached
Version 2: Using a detail view
I have 8 holes that I need to define the locations of in my drawing. I feel that GD&T might be the best course of action here. As you can see in the picture, I have 4 datums, the 4th one being the "main" hole. Every other hole is referenced off of it. Is this correct? How would you do it better?
Version 1L See attached
Version 2: Using a detail view