Sorry guys, I should have been more specific; this is not a rewind. We build custom engineered to order motors, one at a time. everyone of them are different and I would like to have a test in place to help identify connection errors before they become problems which can't be corrected without damaging the integrity of the winding. Surge and resistance just won't catch all connection errors whether made at the engineering level or the connection process. With a test like this, my hope is that we can detect a connection that may be one group off but still symetrically balanced or have the jumpers out of sequence. If the wave pattern is distorted or out of sequence, it seems to me that that would indicate a connection issue and require further investigation. If there truly is a problem, we can correct it and not damage the insulation on the wire. After the winding have been through VPI, it is very difficult to separate the connections for repair and we have elected to build a new winding instead of attempt a repair at that stage.
Is this a good approach or should I be going in a different direction? Again, thanks for your help.