AskTooMuch
Petroleum
It rained during excavation for a spread footing so excavation is flooded and muddy.
Contractor pumped out the water but soil is still wet, and we can't wait for water to dry out.
Can stabilized sand or seal slab be used in this case or it's just a waste of money putting that?
Contractor pumped out the water but soil is still wet, and we can't wait for water to dry out.
Can stabilized sand or seal slab be used in this case or it's just a waste of money putting that?