blrmkr34
Petroleum
- May 29, 2010
- 2
I am builing a spreader beam for an 80k pick. The main beam is a w24x160x 40', the four spreaders are w24x131x12', My question is the weld procedure for fillet welds on lap joints.Pre heat 225, 70 series s.m.a.w rod,, 10 passes 100% coverage for all structural connections, three passes 100% coverage for all gussets, and full pen six passes 100% coverage for all lifting lugs. Is this description sufficient enough for my application, or do you see some red flags. Thank you