Apr 25, 2008 #1 htman Mechanical Joined Apr 12, 2008 Messages 15 Location US Is there a good practice or industry standard for bossed-on Vs set-on connections. More specifically cplgs. Thanks!
Is there a good practice or industry standard for bossed-on Vs set-on connections. More specifically cplgs. Thanks!
Apr 28, 2008 #2 TomBarsh Structural Joined Jun 20, 2002 Messages 1,003 Location CA You may obtain interest from a wider audience by posting this question to the "Boiler and Pressure Vessel engineering" forum (http://www.eng-tips.com/threadminder.cfm?pid=794) This forum generally addresses issues related specifically to the COMPRESS pressure vessel design software. Tom Barsh Codeware Technical Support Upvote 0 Downvote
You may obtain interest from a wider audience by posting this question to the "Boiler and Pressure Vessel engineering" forum (http://www.eng-tips.com/threadminder.cfm?pid=794) This forum generally addresses issues related specifically to the COMPRESS pressure vessel design software. Tom Barsh Codeware Technical Support