SLTA
Structural
- Aug 11, 2008
- 1,641
ok folks. One story house, wood framed floor, slab on grade. I'm going to have them cut the slab and pour a new footing, and install a new steel post to replace a jack post that has failed by crushing the wood. How do they get the perfect length for the post, and then install it so that it's flush? Without the jack action, I'm worried there would be a gap or it would be impossible to actually install. Thoughts?