Thanks, everyone. The goal was to lower the slab up to the footing, and he went a few inches beyond that. This particular contractor has completed many similar projects in the DMV area, so I assume he knows what he’s doing. The basement is already excavated, and this is the maximum depth—slightly more than initially planned. His crew is supposed to pour the gravel, rebar, and slab next week. I will get an engineer there just in case. My architect said this should be fine from the initial look, though he is not an engineer but has seen many underpinned projects