Dear member,
I am working with Petro -chemical plant wherein central colling tower is available for entire plant (process and non -process building). We are purposing water cooled screw chiller based on total thermal load of building for comfort air conditioning for non- process building (i.e. control room, fire control room, central canteen etc ). chilled water supply and return is 44 and 55 deg-F.
Water from central cooling tower is available at supply Pressure of (Min/Normal/Max/Design : 54 / 57 / 64 / 114) in psi and Return pressure of (Min/Normal/Max/Design : 31.5 / 34 / 40 / 114 ) in psi
Supply temperature in Deg-F ( Min/Normal/Design : 82.4 / 91.4 / 149) Return temperature (Max/ Design : 113 / 149 ) at battery limit of each building.
my question is we required separate cooling tower for heat rejection or water from central cooling tower is adequate for heat rejection based on above utility data.
Thank you
I am working with Petro -chemical plant wherein central colling tower is available for entire plant (process and non -process building). We are purposing water cooled screw chiller based on total thermal load of building for comfort air conditioning for non- process building (i.e. control room, fire control room, central canteen etc ). chilled water supply and return is 44 and 55 deg-F.
Water from central cooling tower is available at supply Pressure of (Min/Normal/Max/Design : 54 / 57 / 64 / 114) in psi and Return pressure of (Min/Normal/Max/Design : 31.5 / 34 / 40 / 114 ) in psi
Supply temperature in Deg-F ( Min/Normal/Design : 82.4 / 91.4 / 149) Return temperature (Max/ Design : 113 / 149 ) at battery limit of each building.
my question is we required separate cooling tower for heat rejection or water from central cooling tower is adequate for heat rejection based on above utility data.
Thank you