I am looking for some guidance on replacing a building column that has been removed during previous building modifications. Currently in place is a transfer truss that spans to the adjacent columns. My concern is that if we just tilt up a column and weld it into place it won't take any dead load from the structure. The reason we need to replace the column is to add a bridge crane runway of significant capacity.
My preliminary thoughts would be to attempt to pre-load the column using hydraulic jacks but determining how to quantify this pre-loading is eluding me. Also considering potential settlements and general construct-ability issues I felt the need to reach out. I figured this situation may have been encountered before.
Thanks for any guidance.
My preliminary thoughts would be to attempt to pre-load the column using hydraulic jacks but determining how to quantify this pre-loading is eluding me. Also considering potential settlements and general construct-ability issues I felt the need to reach out. I figured this situation may have been encountered before.
Thanks for any guidance.