A 10x10x0.25 HSS Building column with 35'high ceiling got a forlift impact about 2" from the bottom floor which caused an approximately 6" dia dent (caved in) on one face while adjacent face bulged about 1" out, see attachment. Could some one advise me the best possible method to fix this? Thanks