Imagine a shaft --datum A-- Ø.365/.360-- with 2 thru holes 2x Ø.195/190--positioned with ± .185/.165 tolerance from each end of the shaft.
A slot is added to this shaft in the middle (equal distance from both ends). The slot is .100/.090 and is called datum B
The GD&T is as follow:
For the holes: multiple single segment (not composite )
2x
position of Ø.002 at MMC to A at MMC--first segment
and
position of Ø .004 at MMC to B at MMC--second segment--
For the slot (datum B): position of Ø.002 at MMC with A at MMC
The question for you is: the second segment of the multiple segment callout, isn't it redundant callout?
Simultaneous requirement is implied, since the slot and the holes have the same datum reference frame (positional at MMC to A at MMC). Please help.
Again, I am thinking that position of Ø .004 at MMC to B at MMC--second segment--is redundant, but I am not sure.
A slot is added to this shaft in the middle (equal distance from both ends). The slot is .100/.090 and is called datum B
The GD&T is as follow:
For the holes: multiple single segment (not composite )
2x
position of Ø.002 at MMC to A at MMC--first segment
and
position of Ø .004 at MMC to B at MMC--second segment--
For the slot (datum B): position of Ø.002 at MMC with A at MMC
The question for you is: the second segment of the multiple segment callout, isn't it redundant callout?
Simultaneous requirement is implied, since the slot and the holes have the same datum reference frame (positional at MMC to A at MMC). Please help.
Again, I am thinking that position of Ø .004 at MMC to B at MMC--second segment--is redundant, but I am not sure.