CWEngineer
Civil/Environmental
- Jul 3, 2002
- 269
Are there any requirements for the selection of the height of fill above an reinforced concrete pipe when the pipe is beneath a sloped ground surface? I assume, you would design the pipe for the maximum height of fill, minimum height of fill and 2 feet of fill. However, I am not sure if you would need to use a particular height to capture the height of fills between your max and min heights. Believe some agencies use 10 ft to capture fills below 10 ft for box culverts, but not sure if this is applicable to reinforced concrete pipes. Appreciate your advice.