Enhineyero
Structural
- Sep 1, 2011
- 285
I was thinking, The Strength design is governed by the servicibility and the material strength. Then Why do we allow/design beams to crack at the tension fiber? (because if you can check, when we design using USD method the stress at the tension fiber exceeds the Modulus of Rupture of concrete).
Since the tension fiber will crack even if it has not reached the design moment, then in terms of serviciblity the beam has already failed? because it would be an eyesore for the occupants (if there is no ceiling finish to cover it). Please enlighten me....
Since the tension fiber will crack even if it has not reached the design moment, then in terms of serviciblity the beam has already failed? because it would be an eyesore for the occupants (if there is no ceiling finish to cover it). Please enlighten me....