Code construction is considered as complete when the data report is signed and vessel stamped.
It has nothing to do with "whether put in service" or "still in shop not delivered".
For R stamp on missing part, it depends on various factors: Whether the vessel was PWHT, whether impact tests are required, Mr Bahruni should talk to his AI