1- Pipe location to be confirmed.
2- Machine diggig to start from somewhere close to the pipeline and not over it.
3- Durring digging, pipeline locator should be used to confirm the location and distance to the pipe.
4- When close to the pipe (approx 300mm, use hand dig to expose the pipeline.
5- When pipeline is exposed, machine diggin can safly be used for the rest.
6- For hot tap connection, all confiened space requirement to be met.
7- Depending on the soil type, safety messures to be considered. (eg shoring ...)