Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Pretensioned spun concrete pile - wire cut-off 1

Status
Not open for further replies.

sykimm

Coastal
Joined
Nov 30, 2003
Messages
35
Location
KR
Dear all,

In general details, pretensioned wires shall not be cut during the cut-off for Pretensioned Spun Concrete Pile. Wires shall be connected into the raft footing for connectivity between pile and concrete footing.

However, if we cut the wires the cut-off elevation, then how pile head cut-off would be rehabilitated?

Is it required to remain the pretensioned wire during pile head cut-off?

Please help me.
 
You should have a drawing/specification which you can follow. A common detail is to cut off the pile (including wires) at the cut-off level. Then to either fill the pile with clean sand or to suspend a formwork. Roughen the internal surface of the pile and place a rebar cage, cast concrete to the top level of the pile.

Zambo
 
Thank you, Zambo!

Compared with your comments, such as "common detail", in Japn details, pretensioned wires shall not be cut-off for Pretensioned Spun Concrete Piles.

If you have any web-site on said details, please let me know.

For further help....
 
sorry no web-site or details on-line. I have used the detail I describe twice, once in Malaysia once in Thailand. The rebar cage and the "plug" level inside the pile were on both occasions shown on the project drawings. Doesn't the pile supplier have standard details?

Zambo
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top