Dear all,
In general details, pretensioned wires shall not be cut during the cut-off for Pretensioned Spun Concrete Pile. Wires shall be connected into the raft footing for connectivity between pile and concrete footing.
However, if we cut the wires the cut-off elevation, then how pile head cut-off would be rehabilitated?
Is it required to remain the pretensioned wire during pile head cut-off?
Please help me.