hello,
we did the first pass of vertical weld in storage tank but becuase of raining we stoped the work.after 2 days we started to weld the socand pass without any preheatig and the ambiente temprature was 5-10'C .our refrence standard is API650.for second pass the plates was dry.
can this sequence cuase a problem in our work and is it against the standard.
we did the first pass of vertical weld in storage tank but becuase of raining we stoped the work.after 2 days we started to weld the socand pass without any preheatig and the ambiente temprature was 5-10'C .our refrence standard is API650.for second pass the plates was dry.
can this sequence cuase a problem in our work and is it against the standard.