To be "positive" about your material supply, next time make sure you have a procedure to control/document the raw material stock thru purchasing/receiving/inventory/fabrication/acceptance/etc. If the sheet material in question is not a significant cost, it would be best to order new material with documentation that can be used to positively track the material throughout your manufacturing process.