"Penetration of Floor"..... ????

Where is your Key/First sheet for this project ? .... Is there a Piping Specification that defines all materials and terms

You know the document that defines all abbreviations...

BTW, the drafter is doing a sloppy job with his arrow not pointing to the Piping Penetration symbol..

MJCronin
Sr. Process Engineer
 

I also read penetration of floor...and TOS EL 121200 mm, top of support el.
 
Since it apparently already says "floor penetration" on the drawing, it might be referring to "PlatForm".

 
Platform (PF), top of steel (TOS) elevation
 