NFrancis
Civil/Environmental
- Oct 30, 2009
- 3
I'm designing a concrete slab that going to see an axle load of around 137 kips. My concern is with the contraction joints. PCA method mentions every 18', I doubt that the cost estimate for the foundation accounted for all the dowels/support baskets that would be necessary to follow these guide lines. Any suggestions? Slab is 72 m x 36 m, 18" thick (T and B layer of temp and shrinkage steel) w/ thickened edges. Thanks