ajk1
Structural
- Apr 22, 2011
- 1,791
What is the general practice for basement slab-on-grade of unheated parking garages with respect to the sawcut control joints: are they left unfilled (i.e they are eventually filled with dirt over the years) , or are they filled with an appropriate material? I am in Ontario, Canada, so I am particularly interested in this geographic area, although responses from other areas would be of interest too. I believe that I have generally specified that they be partially filled with an appropriate flexible material and closed cell backer rod below, but it is an expense and I am not sure that much is achieved by this.