Hello,
I looking for parapet detail in stud wall building.Parapet is about 3 ft tall above roof ,I am thinking of cantilevering channels at 4 ft spacing and infilling metal studs at 16 in o.c. Now I am wondering how the torsion (moment from channel) to the wall be taken into design of wall.
The top of the metal studs wall is connected to HSS load distributor tube and the channel will be welded to the HSS.I have attached a sketch link (don't sure if the link works)
Any experience and thoughts appreciated.
I looking for parapet detail in stud wall building.Parapet is about 3 ft tall above roof ,I am thinking of cantilevering channels at 4 ft spacing and infilling metal studs at 16 in o.c. Now I am wondering how the torsion (moment from channel) to the wall be taken into design of wall.
The top of the metal studs wall is connected to HSS load distributor tube and the channel will be welded to the HSS.I have attached a sketch link (don't sure if the link works)
Any experience and thoughts appreciated.