ron,
You need to get around. Staged stressing for crack control, and then for self weight load balancing is a widely used practice. Some engineers require 25% at one day, 75% at 3 to 4 days, then 100% just before grouting the tendons. And PT slabs do have shrinkage cracking problems, which when they occur typically involve wider cracks at greater spacing than for conventionally reinforced slabs.