Jun 8, 2018 #1 Amanda123 Petroleum Joined Feb 7, 2018 Messages 26 Location MY Hello, everybody here, How to we determine if a nozzle pad require for vessel? and if required how to calculate the pad size? Any comments are appreciated.
Hello, everybody here, How to we determine if a nozzle pad require for vessel? and if required how to calculate the pad size? Any comments are appreciated.
Jun 8, 2018 #2 XL83NL Mechanical Joined Mar 3, 2011 Messages 3,115 Location NL Your calculations will determine whether or not your nozzle needs a repad to meet the Code requirements openings. Review the appropriate section of ASME VIII Div 1. Upvote 0 Downvote
Your calculations will determine whether or not your nozzle needs a repad to meet the Code requirements openings. Review the appropriate section of ASME VIII Div 1.
Jun 8, 2018 #3 SnTMan Mechanical Joined Jan 22, 2005 Messages 6,847 Location US or other (unspecified) Code of Construction. The problem with sloppy work is that the supply FAR EXCEEDS the demand Upvote 0 Downvote
or other (unspecified) Code of Construction. The problem with sloppy work is that the supply FAR EXCEEDS the demand
Jun 9, 2018 #4 FFEA Mechanical Joined Jul 25, 2015 Messages 17 Location AR Assuming that it is an ASME VIII, Div. 1 construction, please read UG-37 and Figure UG-37.1. Upvote 0 Downvote
Jun 20, 2018 #5 israr1 Mechanical Joined Jul 18, 2016 Messages 19 Location IN Refer UG-36, UG-37 & UG-40 of ASME SEC VIII DIV 1. Upvote 0 Downvote