dcarr82775
Structural
- Jun 1, 2009
- 1,045
I have a condition where I need to provide minimum shear steel in a beam, and I also need to provide shear steel for torsion. The amount of steel I need to provide for torsion is greater than the 50*bw*s/fy minimum. I believe that I am therefore covered for the minimum shear steel as well per 11.5.5.2. Would you agree?