Hello All,
I am designing a pump station ( 3 pumps, 2d/1s) pumping brackish water with a total flow of 70m3/hr through a DN160 Ductile iron pipe buried 1.5 m from FGL. The total length of the pipe is 2700m discharging into a Box Culvert. To reduce the water hammer effect I have installed a pressure tank at the pump station upstream and a swing Check valve along the line on every 200m. Is 200m a reasonable distance? is there any reference showing the right distance between Check valves?
Thank You
Marc
I am designing a pump station ( 3 pumps, 2d/1s) pumping brackish water with a total flow of 70m3/hr through a DN160 Ductile iron pipe buried 1.5 m from FGL. The total length of the pipe is 2700m discharging into a Box Culvert. To reduce the water hammer effect I have installed a pressure tank at the pump station upstream and a swing Check valve along the line on every 200m. Is 200m a reasonable distance? is there any reference showing the right distance between Check valves?