Running with the post by Warrenslo that the top 3 levels collapsed first, along with the fact that there was an on site crane lifting roofing materials onto the roof the day before, there is a good chance the roofer overloaded a section of roof with materials. Also, on concrete slab roofs it is common to use a small track bobcat to remove existing roofing and save on labor. A Bobcat MT85 is commonly used and weighs about 3200 lbs empty. Also, it seems common amongst demolition workers, that they like to stockpile waste removed materials in large piles weighing several 1000 lbs.