I am working on a project to separate stormwater out of a combined system. The combined system is a 48" pipe that goes into a wooded right of way into a control structure for a CSO outfall. When not raining, the sanitary flow continues into a a smaller diameter pipe. When it rains, it overflows. The new stormwater pipe will be placed along side the existing CSO pipe and terminate prior to the CSO structure at an existing, but failing, outfall.
The new stormwater pipe will terminate at a new junction manhole in an existing outfall from a wetland area. The existing outfall is in very rough shape and will be replaced. Currently, the outfall drops 20 feet over 115 foot run for a slope of 17%. After modeling the proposed stormwater pipe, the velocity for a 25 year storm at the outfall is 25 fps. A plunge pool will be designed and channel lining downstream will be included. Also, as the attachment shows, the slope near the existing outfall will be rebuilt as it is suffering from erosion.
If this same slope is kept, what type of precautions should be taken to keep the pipe sections together, particularly at the outlet? Should I consider a not as steep outfall by designing a drop structure for the new junction manhole to try and reduce the velocity?
The new stormwater pipe will terminate at a new junction manhole in an existing outfall from a wetland area. The existing outfall is in very rough shape and will be replaced. Currently, the outfall drops 20 feet over 115 foot run for a slope of 17%. After modeling the proposed stormwater pipe, the velocity for a 25 year storm at the outfall is 25 fps. A plunge pool will be designed and channel lining downstream will be included. Also, as the attachment shows, the slope near the existing outfall will be rebuilt as it is suffering from erosion.
If this same slope is kept, what type of precautions should be taken to keep the pipe sections together, particularly at the outlet? Should I consider a not as steep outfall by designing a drop structure for the new junction manhole to try and reduce the velocity?